SES recent helped provide J2R Demolition a solution, on a rip out project in Pontllanfraith. The problem – circa 35 tonnes of wall render and plaster, on a first floor – with poor access. Keen to avoid having to have their operatives hand ball the material down flights of stairs, or out onto scaffolding into a telehandler bucket – they contacted us for suggestion.
Utilizing one of our RSP ESE6 Suction Excavators, along with 10″ flexible extension hoses, we were able to help remove the material, with significantly less manual handling. A couple of hours of moving the hose around and some shovelling, we had the material out of the building and neatly tipped ready for disposal.