J2R Demolition – Clear Up

SES recent helped provide J2R Demolition a solution, on a rip out project in Pontllanfraith. The problem – circa 35 tonnes of wall render and plaster, on a first floor – with poor access. Keen to avoid having to have their operatives hand ball the material down flights of stairs, or out onto scaffolding into a telehandler bucket – they contacted us for suggestion.

Utilizing one of our RSP ESE6 Suction Excavators, along with 10″ flexible extension hoses, we were able to help remove the material, with significantly less manual handling. A couple of hours of moving the hose around and some shovelling, we had the material out of the building and neatly tipped ready for disposal.

Download our free brochure

Blogs

  • Cast Iron Gas Mains Replacement

    SQS is a leading utility solutions provider with over twenty five years experience, Serving the electricity, gas, water, telecoms, Local Authority and commercial sectors in London, the Home Counties and the South East.

    More Information
  • Exposing Service Connections

    MV KELLY CIVIL ENGINEERING DELIVER COMPLEX CIVIL ENGINEERING SOLUTIONS ACROSS A WIDE SPECTRUM OF PROJECTS IN THE RESIDENTIAL, INFRASTRUCTURE AND COMMERCIAL SECTORS

    More Information
  • J2R Demolition – Clear Up

  • Use the form below to book a call back

    A member of our team will be in touch.